登录

  • 登录
  • 忘记密码?点击找回

注册

  • 获取手机验证码 60
  • 注册

找回密码

  • 获取手机验证码60
  • 找回
毕业论文网 > 外文翻译 > 理工学类 > 轮机工程 > 正文

排水量25500吨油化船动力装置设计外文翻译资料

 2022-11-08 20:44:30  

Sample exercise - 20 (A-III/2)

Exercise Title

High-voltage installation

Task

Understanding design features of high-voltage installations

Function and Level

Electrical, electronic and control engineering at the management level

Competence

Manage operation of electrical and electronic control equipment

Requirements (K.U.P.)

Design features of high-voltage installations

Estimated Duration

2 hour/3 ~ 4 trainees

Outline of Training

3 ~ 4 trainees establish a group and the group perform simulation program following instructions by the program on high-voltage

installations for the purposes of understanding design features of high-voltage installations as follow:

  • system configuration and isolation of high-voltage equipment
  • high-voltage generator
  • high-voltage main switch board
  • high-voltage transformer
  • convertor for controlling high-voltage motors
  • high-voltage motors
  • electrical propulsion system

Initial Condition

----

Specific Purpose

The training allows the trainees to understand design features of

:

  • high-voltage generator
  • high-voltage main switch board
  • high-voltage transformer
  • convertor for controlling high-voltage motors
  • high-voltage motors
  • propulsion motors

Briefing

Explain briefly the following

  • outline of the training
  • how to carry on the training
  • effects of high-voltage on personnel
  • design features applied to high-voltage installations
  • characteristics and advantages of high-voltage motors

Implementation

Start the simulation and let the trainees perform the simulation

program for identifying and understanding:

  • system configuration and isolation of high-voltage equipment
    • dual system
    • isolation
  • high-voltage generator
    • types and specifications
    • protection of terminal
  • design features applied to high-voltage main switch board
    • earthing switch on main BUS bar
    • arc detecting system
    • insulation distance
    • safety functions
  • high-voltage transformer
    • types of transformer

HTW 4/3/7/Add.1 Annex, page 146

- cooling system

  • convertor for controlling high-voltage motors
    • types of converter
    • cooling system
  • high-voltage motors
    • types of motors
    • cooling system
  • characteristic of propulsion motor

Debriefing

Explain briefly the following

  • precaution to be strictly observed when handling high-voltage installations
  • characteristics of high-voltage installations
  • characteristics of electrical propulsion ship

HTW 4/3/7/Add.1

Annex, page 147

Sample exercise - 21 (A-III/2)

Exercise Title

Heavy weather

Task

Address heavy weather assessing running conditions of the main

diesel engine

Function and Level

Maintenance and repair at the management level

Competence

Detect and identify the causes of machinery malfunctions and correct faults

Requirements (K.U.P.)

Detection of machinery malfunction, location of faults and action to prevent damage

Estimated Duration

2 hour

Outline of Training

4 ~ 5 trainees establish a group and the group finds heavy load caused by heavy weather to the main engine and addresses the heavy load in accordance with specific load/propeller curve under

the direction of the group leader.

The instructor creates heavy weather conditions and prepares specific load/propeller curve of the simulated main diesel engine

Initial Condition

Seagoing

Specific Purpose

The training allows the trainees to:

  • acquire knowledge on how to address heavy weather
  • understand meanings of heavy load conditions
  • characteristics of main diesel engine
  • understand how engine output moves under heavy load conditions

Briefing

Explain briefly the following

  • outline of the training
  • how to carry on the training
  • changes in running parameters under heavier weather
  • specific load/propeller curve of the simulated main diesel engine

Implementation

Start the simulation and let the trainees:

  • confirm running conditions of the main engine and auxiliary machinery

The instructor creates a heavy weather and lets the trainees to:

  • check the engine revolution speed, output and other running parameters using the measurement tables
  • assess the data and figure out the changes in engine load and the running point of the main engine over to the engine

speed

HTW 4/3/7/Add.1 Annex, page 148

  • decide reduction of the engine load to avoid over torque
  • decrease the engine load to the predetermined speed
  • check the running parameters of the engine
  • check running condition of other systems such as power generation, FWG and steam genera

    剩余内容已隐藏,支付完成后下载完整资料


    Sample exercise - 20 (A-III/2)

    Exercise Title

    High-voltage installation

    Task

    Understanding design features of high-voltage installations

    Function and Level

    Electrical, electronic and control engineering at the management level

    Competence

    Manage operation of electrical and electronic control equipment

    Requirements (K.U.P.)

    Design features of high-voltage installations

    Estimated Duration

    2 hour/3 ~ 4 trainees

    Outline of Training

    3 ~ 4 trainees establish a group and the group perform simulation program following instructions by the program on high-voltage

    installations for the purposes of understanding design features of high-voltage installations as follow:

    • system configuration and isolation of high-voltage equipment
    • high-voltage generator
    • high-voltage main switch board
    • high-voltage transformer
    • convertor for controlling high-voltage motors
    • high-voltage motors
    • electrical propulsion system

    Initial Condition

    ----

    Specific Purpose

    The training allows the trainees to understand design features of

    :

    • high-voltage generator
    • high-voltage main switch board
    • high-voltage transformer
    • convertor for controlling high-voltage motors
    • high-voltage motors
    • propulsion motors

    Briefing

    Explain briefly the following

    • outline of the training
    • how to carry on the training
    • effects of high-voltage on personnel
    • design features applied to high-voltage installations
    • characteristics and advantages of high-voltage motors

    Sample exercise - 20 (A-III/2)

    训练标题

    高压设备

    任务

    了解高压装置的设计特点

    职能.责任及别

    管理级电气、电子和控制工程

    适任

    电气和电子控制设备的管理操作

    要求(知识。理解和熟练)

    高压装置的设计特点

    所需时间

    2小时/ 3 ~ 4学员

    训练大纲

    • 3~4名学员成立一个小组,小组按照高压指令程序执行模拟程序,以解高压装置的设计特点如下:

    -系统配置和高压设备的隔离

    -高压发电机

    -高压主开关板

    -高压变压器

    -变流器,用于控制高压电机

    -高压电机

    -电力推进系统

    初始条件

    ----

    培训目的

    培训使学员了解下列设计特点:

    • 高压发电机
    • 高压主开关板
    • 高压变压器
    • 变流器,用于控制高压电机
    • 高压电机
    • 推进电机

    简报

    简要解释下列内容

    • 培训大纲
    • 如何进行培训
    • 高压对人员的影响
    • 高压装置的设计特性
    • 高压电动机的特点与优势

    Sample exercise - 20 (A-III/2)

    Implementation

    Start the simulation and let the trainees perform the simulation

    program for identifying and understanding:

    • system configuration and isolation of high-voltage equipment
      • dual system
      • isolation
    • high-voltage generator
      • types and specifications
      • protection of terminal
    • design features applied to high-voltage main switch board
      • earthing switch on main BUS bar
      • arc detecting system
      • insulation distance
      • safety functions
    • high-voltage transformer
      • types of transformer

    - cooling system

    • convertor for controlling high-voltage motors
      • types of converter
      • cooling system
    • high-voltage motors
      • types of motors
      • cooling system
    • characteristic of propulsion motor

    Debriefing

    Explain briefly the following

    • precaution to be strictly observed when handling high-voltage installations
    • characteristics of high-voltage installations
    • characteristics of electrical propulsion ship

    Sample exercise - 20 (A-III/2)

    实施

    启动模拟,让学员执行模拟程序的识别和理解:

    -高压设备的系统配置和隔离

    -双系统

    -隔离

    -高压发电机

    -类型和规格

    -终端保护

    -高压开关板设计功能

    -主汇流排的接地开关

    -检测系统

    -绝缘距离

    -安全功能

    -高压变压器

    -变压器类型

    -冷却系统

    • 高压电机变频控制
      • 转换器类型
      • 冷却系统
    • 高压电机
      • 电机类型
      • 冷却系统
    • 推进电机特点

    报告

    简要解释以下

    • 安装高压装置时应注意的预防措施
    • 高压设备的特点
    • 电力推进船的特点

    Sample exercise - 21 (A-III/2)

    Exercise Title

    Heavy weather

    Task

    Address heavy weather assessing running conditions of the main

    diesel engine

    Function and Level

    Maintenance and repair at the management level

    Competence

    Detect and identify the causes of machinery malfunctions and correct faults

    Requirements (K.U.P.)

    Detection of machinery malfunction, location of faults and action to prevent damage

    Estimated Duration

    2 hour

    Outline of Training

    4 ~ 5 trainees establish a group and the group finds heavy load caused by heavy weather to the main engine and addresses the heavy load in accordance with specific load/propeller curve under

    the direction of the group leader.

    The instructor creates heavy weather conditions and prepares specific load/propeller curve of the sim

    剩余内容已隐藏,支付完成后下载完整资料


    资料编号:[138690],资料为PDF文档或Word文档,PDF文档可免费转换为Word

您需要先支付 30元 才能查看全部内容!立即支付

企业微信

Copyright © 2010-2022 毕业论文网 站点地图