摘 要

这次选择工程造价作为毕业设计的研究课题,一方面可以复习及巩固之前所学习的理论知识,另一方面则可以在毕业设计的制作过程中学习到课本以外甚至现实工程造价的知识要点,经过此次的学习锻炼,可以让自己把所学的课本知识与实际相结合,从而更加合理的运用知识,为以后参与到实际工作打下扎实的基础,培养自己的逻辑思维,计算能力,锻炼严谨的科学态度,认真的工作学习作风。

这次毕业设计的工程项目是金湾安置小区,主要内容是编制招标文件与参与投标企业的具体投标报价。该次毕业设计的主要学习内容就是编制招标文件,投标文件。然而在编制招标文件之前,第一步是要阅读工程设计图纸及说明,并看懂设计结构内容,清楚了解整个工程概况,以及相关工程量的计算规范等材料,接着根据小组分工各自计算所负责的工程量计算和编制清单,正确计算工程量以免因为资料准备不充分影响整个毕业设计进程。在编制招标文件中,用未来软件对编制好的工程量清单进行投标报价,完成后进行调价,换算环节。最后根据企业的实际情况进行技术部的编制。

以上部分就是毕业设计的整个过程。

关键词:工程造价;招标;投标

Jin Wan Farmer resettlement residential project tender documentation and B companies bidding

Abstract

Select the direction of the project cost as a problem of this design study, they can consolidate their theoretical knowledge learned at school, inside the classroom can also learn some things not learned in graduate design process, can make their own learning and in the future work better integrate theory with practice, to exercise their own good logical thinking ability, cultivate the spirit of perseverance and rigorous study of work style.

The Graduation Project is designed to Jin Wan Farmer Resettlement cells. Including the preparation of tender documents and bidding companies.

Graduation entire design process is the most important job is the preparation of tender documents and tender documents. In the preparation of tender documents, the first familiar with the drawings, project profiles, related engineering calculation specifications and other information, and then perform the inventory calculation of quantities and quantities of preparation, avoid in the calculation process in the Middle East for the West to find the correct calculation of quantities it is in the tender documents the most important part. In the preparation of tender documents, with the future of software for the preparation of a good amount of inventory works tender offer, including the conversion price and other components, the next most important part is the preparation of technical standards, technical standards in this session should be based on business conditions combined with the actual conduct of the preparation. That is the whole design of the most important graduation.

After the preparation of bidding documents, even if the end of the whole graduation.

Keywords: Project cost; tender; Bid

目 录

摘 要 I

Abstract II

第一部分毕业设计综述 1

第一章 工程概况 2

第二章 毕业设计任务 2

第二部分金湾安置小区招标文件编制 7

第一章 招标公告(未进行资格预审) 9

第二章 投标人须知 11

第三章 评标办法(综合评估法) 14

第四章 合同条款及格式 17

第五章 工程量清单 27

第六章 图纸 43

第七章 技术标准和要求 44

第三部分金湾安置小区C企业投标报价 45

第一章 投标函及投标函附录 47

第二章 法定代表人身份证明(略) 48

第三章 授权委托书(略) 48

第四章 联合体协议书(略) 48

第五章 投标保证金 48

第六章 已标价工程量清单(见下表) 48

第七章 施工组织设计 81

第八章 项目管理机构(略) 88

第九章 资格审查资料(略) 88

第四部分浅谈施工组织设计对工期的影响 91

结束语 95

谢 辞 96

参 考 文 献 97

第一部分

毕业设计综述

第一章 工程概况

1. 基础结构

(1)该桩基工程采用静力预制钢筋混泥土方桩,现浇桩承台基础,基础无筋混泥土垫层。

(2)平整场地,挖三类土,用自卸汽车来实现余方弃置。