年产230万平方米抛釉砖生产线扩初设计毕业论文
2022-03-30 20:55:18
论文总字数:18962字
摘 要
工厂设计是工程建设的首要前提。按照要求提供优质的设计文件,使得工厂建设得以顺利进行,并且为投入生产创造必要条件。合理有效的工厂设计,对于项目的新建、改建和扩建等具有缩短工期、节约投资、提高经济效益的关键性作用。本设计是年产230万平方米抛釉砖生产线扩初设计,该设计的主要目的是选取合适的生产设备,使得工厂的生产工艺达到最优化,并且成本控制在最佳范围。设计内容具体包括全厂总平面设计、原料车间及联合车间的设计,生产两种规格的抛釉砖,一种是规格型号为300×300×5mm的抛釉砖130万平方米,另一种是规格型号为800×800×5mm的抛釉砖100万平方米。
关键词:抛釉砖 设计 原料车间 联合车间
Expanding the preliminary design for glazed tile production lines of 2.3million square meters per year
Abstract
The design of the factory is the first important step of engineering building. The assignment of design is to offer work with high quality. So the construction of the factory or technology reconstruction will carry out successfully and it also benefit for the production. Advanced and reasonable design will be very important for new building item, rebuilding item, expanding item, shortening time limit for a project and improving economy benefit. It is that a glazed tile factory produces two glazed tile producing line of 2.3million square meters per year to expand the preliminary design. The aim is to choose the good devices to make the factory production line go to best and to confine the cost of the factory building. The design task includes the whole factory total level design, raw material workshop design, unite workshop design. Producing two kings of the glazed tiles, one is 300×300×5mm,the annual output is 1,300,000 square meters; The other one is 800×800×5mm,the annual output is 1,000,000 square meters.
Key words: glazed tile design material workshop unite workshop
目 录
摘要············································································································I
ABSTRACT································································································II
第一章 前言···························································································1
第二章 总说明·······················································································2
2.1 总论··································································································2
2.2 生产基本要素······················································································3
2.2.1 生产纲领·····················································································3
2.2.2 各工序的工作制度·········································································3
2.3 生产工艺和主机设备·············································································5
- 总图 运输················································································ 11
3.1 厂区的自然条件················································································· 11
3.2 总平面布置······················································································· 11
3.2.1 基本依据····················································································11
3.2.2 厂区的划分及车间组合··································································12
3.3 厂区外交通运输················································································· 12
3.4 厂区建筑·························································································· 12
3.5 总图技术经济指标·············································································· 14
- 工艺设计····················································································16
4.1 基本设计原则和依据··········································································· 16
4.1.1 基本设计原则············································································· 16
4.1.2 设计依据··················································································· 16
4.2 车间工艺设计···················································································· 16
4.2.1 原料车间··················································································· 16
4.2.2 联合车间··················································································· 21
结论·········································································································· 27
参考文献··································································································28
致谢·········································································································29
- 前 言
设计是基本建设和技术改造的一个前期重要工作。按照要求提供优质的设计文件,使得工厂建设得以顺利进行,并且为投入生产创造必要条件。合理有效的工厂设计,对于项目的新建、改建和扩建等具有缩短工期、节约投资、提高经济效益的关键性作用。本次设计用时四个多月,在吴红忠老师的悉心指导以及其他老师同学的热心帮助下,把大学学习的理论和实践结合起来,做到学以致用。我很珍惜这次的机会并且感谢导师的全力相助。
请支付后下载全文,论文总字数:18962字
您可能感兴趣的文章
- 蒸养纤维掺杂高铁低钙水泥混凝土的抗海水冲磨性能研究文献综述
- TIPA对水泥-锂渣体系力学性能和水化性能的影响外文翻译资料
- TEA对锂渣-水泥复合粘结剂流变性能及水化性能的影响外文翻译资料
- 硫酸铝无碱液体促进剂的效果研究烷醇胺对硅酸盐水泥水化过程的影响外文翻译资料
- 新型C-A-S-H/PCE纳米复合材料:设计表征和对水泥水化的影响外文翻译资料
- 工业中碳捕获技术以及以水泥回转窑作为核心的吸附再生器外文翻译资料
- Ca/Al层状双氢氧化物的制备及其结构对水泥早期强度的影响外文翻译资料
- 蒸汽养护后混凝土养护方法对混凝土机械强度和透气性的影响外文翻译资料
- 含白云石或石灰石的偏高岭土水泥在相组成与抗压强度的异同外文翻译资料
- 与硅质铁尾矿结合的混凝土的耐久性外文翻译资料