城市污水处理厂综合评价指标体系研究任务书
2020-06-03 21:54:37
1. 毕业设计(论文)的内容和要求
主要研究内容包括:
1、从宏观上研究污水处理厂的评价方法,对污水处理厂的综合评价进行范围界定以更好地明确研究内容。
2、概述城市污水处理厂的现状和存在问题,确定清洁生产审核重点和目标。
2. 参考文献
[1]中华人民共和国清洁生产促进法[Z].环境保护部,2012. [2]张文礼,许子年.行业协会要积极助推清洁生产[J].中国机电工业,2009,4:96-99. [3]Johannes Fresner,Jurgen Jantschgi,et al.The theory of inventive problem solving (TRIZ) as option generation tool within cleaner production projects[J].Journal of Cleaner Production,2010,18:128-136. [4]Abhishek Kumar,Shibu Clement,et al.Structural modeling and analysis of an effluent treatment process for electroplating#8212;A graph theoretic approach[J].Journal of Hazardous Materials,2010,19:748-76 [5]重点企业清洁生产审核程序的规定[Z].环境保护部,2005. [6]孟繁宇,樊庆锌,纪楠,梁松.[J]城市污水处理厂综合评价指标体系构建与应用研究,环境与可持续发展,2012:84-90 [7]苏环办[2014]3号,江苏省化工行业废气污染防治技术规范[S],江苏省环保厅,2014. [8]Chang-Chun Tsai.A research on selecting criteria for new green product development project:taking Taiwan consumer electronics products as an example[J].Journal of Cleaner Production,2012,25:106-115. [9]中华人民共和国国家发展和改革委员会.清洁生产评价指标体系编制通则[R].2013. [10]Xiaoqing Donga,Chaolin Li,et al.Application of a system dynamics approach for assessment of the impact of regulations on cleaner production in the electroplating industry in China[J].Journal of Cleaner Production,2012,20:72-81. [11]王丽玲,张树深.张芸.城镇污水处理厂清洁生产等级评价二元语义模型与方法.[J].中国环境科学,2014,34(11):2976-2984 [12]李智.清洁生产审核方法在工艺改进中的应用[J].云南化工,2015(4):55-59. |
|
|
3. 毕业设计(论文)进程安排
起讫日期 |
设计(论文)各阶段工作内容 |
备 注 |
2月20日~3月10日 |
撰写开题报告(文献综述)、 制定论文框架方案 |
两周时间 |
3月11日 ~5月19日 |
案例收集归纳、方案筛选与产生 |
及时与老师沟通交流 |
5月20日~6月2日 |
案例分析、验算和审核、撰写论文初稿 |
两周时间 |
6月3日 |
交论文初稿 |
|
6月3日~ 6月11日 |
修改并完成论文 |
一周时间 |
6月12日~ 6月14日 |
机动、答辩前准备 |
五天时间 |