登录

  • 登录
  • 忘记密码?点击找回

注册

  • 获取手机验证码 60
  • 注册

找回密码

  • 获取手机验证码60
  • 找回
毕业论文网 > 毕业论文 > 理工学类 > 电气工程及其自动化 > 正文

源荷储各类柔性资源调峰潜力分析方法毕业论文

 2022-01-23 21:51:19  

论文总字数:39302字

摘 要

近年来,随着电网用电侧接入具备源荷双重特征的新型负荷的负荷量不断增加,大量可以与电网互动的新型负荷参与到电网的调度作为传统发电调度方式的补充,柔性负荷在电网调度中的作用也因此成为国内外关注的热点。同时也出现了负荷聚合商、智能楼宇等新的用能形式,大量电力负荷可通过不同的需求响应方式参与电网互动,为电网提供了丰富的可调度资源。

本文通过学习国内外关于需求响应的发展与实际应用,得到建立成熟的需求响应市场所需的条件以及我国目前电网调度市场的发展空间;通过掌握柔性资源参与电网调度运行中涉及的不同类别的调峰资源、柔性负荷和储能设备,从柔性资源作为电网调度资源的角度对我国目前参与电网调度运行的柔性负荷分类并根据其调度模式和响应特性建立数学表达。通过对不同类别的负荷建模,结合削峰填谷、消纳清洁能源等电网多种运行场景的调度需求,分析电网调峰资源并对调峰资源进行设计研究,重点分析和量化评估柔性负荷参与电网调度能力,分析研究多类柔性负荷资源响应特性与电网调度需求的匹配方式及参与电网调度的潜力。

关键词:柔性负荷 调峰可行性 互动潜力 风电消纳

Analysis of method of peaking potential of flexible resources in source and reservoir

Abstract

In recent years, as the load on the power-side side of the grid is increased, the new load with the dual characteristics of the source and the load is increasing. A large number of new loads that can interact with the grid participate in the dispatching of the grid as a supplement to the traditional power generation dispatching mode. The flexible load is in the grid. The role of scheduling has therefore become a hot spot at home and abroad. At the same time, new energy consumption forms such as load aggregators and intelligent buildings have emerged. A large number of power loads can participate in grid interaction through different demand response modes, providing abundant schedulable resources for the power grid.

By studying the development and practical application of demand response at home and abroad, this paper obtains the conditions needed to establish a mature demand response market and the development space of China's current power grid dispatch market. By grasping the flexible resources to participate in different types of tuning involved in grid dispatching operation Peak resources, flexible loads and energy storage equipment, from the perspective of flexible resources as grid dispatching resources, classify the flexible loads that China is currently participating in grid dispatching operations and establish mathematical expressions based on their scheduling modes and response characteristics. By modeling different types of loads, combining the scheduling requirements of various operational scenarios such as peak-cutting and valley filling, and eliminating clean energy, the paper focuses on analyzing and quantifying the flexible load participation in grid dispatching capability, analysis of power grid peaking resources and design research on peaking resources and analyzing the response characteristics of multiple types of flexible load resources about matching with grid dispatching requirements and the potential to participate in grid dispatching.

Key Words: Flexible resources; Peak shaving feasibility; Interactive potential; Wind power consumption

目 录

摘要 I

ABSTRACT II

第一章 绪论 1

1.1 研究背景 1

1.2 国内外研究现状 1

1.3 本文结构及研究工作 4

第二章 柔性负荷参与调度分析 6

2.1 需求侧负荷 6

2.1.1分类与定义 6

2.1.2 柔性负荷响应模型 7

2.2 柔性负荷参与调度分析 9

2.2.1 可调度潜力 10

2.2.2 柔性负荷参与电网调度能力评估指标 11

2.3 本章小结 12

第三章 柔性资源的调峰设计研究 14

3.1 电力系统调峰设计 14

3.1.1 电力系统调峰资源 14

3.1.2 系统调峰需求量 16

3.1.3 调峰设计方案 16

3.2 需求侧负荷参与调峰分析 17

3.2.1 风电出力预测模型 18

3.2.2 负荷数据聚类分析 18

3.2.3 需求侧负荷参与调峰分析 19

3.3 本章小结 20

第四章 算例分析 22

4.1 算例参数 22

4.2调峰分配方式 23

4.3仿真结果及分析 24

第五章 总结与展望 33

参考文献 36

致谢 39

附录 40

第一章 绪 论

1.1 研究背景

请支付后下载全文,论文总字数:39302字

您需要先支付 80元 才能查看全部内容!立即支付

企业微信

Copyright © 2010-2022 毕业论文网 站点地图