登录

  • 登录
  • 忘记密码?点击找回

注册

  • 获取手机验证码 60
  • 注册

找回密码

  • 获取手机验证码60
  • 找回
毕业论文网 > 毕业论文 > 土木建筑类 > 工程管理 > 正文

PPP模式在城市地下综合管廊建设中的应用毕业论文

 2021-09-27 20:27:23  

摘 要

由于我国城镇化的加速发展、现有管网设计落后,城市地下管线急需扩容、更新、维修,而由此带来频繁的道路开挖不仅造成了环境、噪音污染,同时造成的交通拥堵也给居民的生活出行带来极大的不便,此外也极大的影响了道路沿线的商业利益。已有经验证明,综合管廊是解决这些问题的有效方法。

目前,我国已经建成了一批地下综合管廊,但其运营效果不佳,且管廊并没有在我国大范围建设。本文通过研究我国现存管廊的建设运营现状,找出运营中存在的问题,并结合现有的几种建设运营模式找出适合我国的解决方案,即采用PPP模式中的前补偿和后补偿模式来为政府寻求合作伙伴。同时为了进一步推进PPP模式在综合管廊中的应用,文中对后期运营管理机制提出建议,并在分析管廊费用-效益的基础上,根据“谁受益谁付费”的原则确定政府和各管线单位为费用承担主体,同时对具体费用制定方法给出一些建议。

关键词:综合管廊 PPP模式 运营管理 费用分摊

Abstract

Expansion,renovation and maintenance of urban underground pipelines seem to be the most urgent task for the government due to the rapid development of China's urbanization and the backward desigh of the exsiting network.The frequent road excavations have made a big environmental and noise pollution and the traffic congestion has brought much inconvenience to the citizens's daily lives.It also diminish the commercial profits of the stores along the road. It has proved that utility tunnel is the best way to address those problems.

Now,the government has built a batch of the underground utility tunnel,but they didn't work as we expected and the underground utility tunnel werent built on a large scale in china.This paper target at finding out the exsting problems during operation and comparing the current modes of operations to propose the most suitble solution through researching on the current situation of utility tunnel's operations.,as a result of which,before and after conpensation inPpp-mode to seek partners for the government are strongly recommended .Meanwhile,for the increasing application of PPP mode in the utility tunnel,this paper provides suggesions with the mechanism of the later operation management,and according to the principle that whoever benefits pays,it determines the government and the pipeline units as the main body of cost and in the meantime give some advice concerning the method of setting specific price on the basis of analyzing the costs and benefits of the utility tunnel.

Keywords: the utility tunnel,PPP mode,operations management,cost allocation.

目 录

摘要··············································································································i

ABSTRACT·······································································································ii

第1章 绪论···································································································1

1.1 问题的提出与研究意义·············································································1

1.2 国内外研究现状······················································································2

1.2.1 国外研究现状····················································································2

1.2.2 国内研究现状····················································································3

1.3 研究内容·······························································································4

1.4 研究方法·······························································································5

第2章 国内外综合管廊运营管理现状分析··························································· 6

2.1 国外综合管廊运营管理现状·······································································6

2.1.1 法国等欧洲国家综合管廊运营管理现状··················································6

2.1.2 日本综合管廊运营管理现状·································································6

2.2 国内综合管廊运营管理现状·······································································7

2.2.1 我国台湾地区综合管廊运营管理现状·····················································7

2.2.2 广州大学城综合管廊运营管理现状························································8

2.2.3 昆明综合管廊运营管理现状·································································9

2.2.4 横琴新区综合管廊运营管理现状··························································10

2.2.5 苏州综合管廊运营管理现状································································11

2.3 我国现有综合管廊运营管理模式比较·························································11

2.4 我国综合管廊运营管理方面的进步与存在的问题··········································13

2.4.1 我国在综合管廊建设、运营管理上的进步··············································14

2.4.2 我国综合管廊建设运营中存在的问题····················································16

第3章 PPP模式应用于综合管廊的理论基础························································16

3.1 综合管廊概述·······················································································16

3.1.1 综合管廊的优缺点············································································16

3.1.2 综合管廊的经济属性·········································································16

3.2 PPP模式概述························································································17

3.2.1 PPP模式的概念及特点·······································································17

3.2.2 PPP模式的类型················································································17

3.2.3 PPP模式的基本结构及一般运作流程·····················································18

3.3 PPP模式运用于综合管廊的可行性分析·······················································19

第4章 综合管廊PPP模式的结构设计································································21

4.1 PPP模式下综合管廊的相关主体································································21

4.1.1 综合管廊建设的发起者······································································21

4.1.2 综合管廊的使用者············································································21

4.1.3 综合管廊的投资参与者······································································21

4.1.4 综合管廊的最终受益者······································································22

您需要先支付 80元 才能查看全部内容!立即支付

企业微信

Copyright © 2010-2022 毕业论文网 站点地图