新会碧桂园7号~10号楼施工总承包投标文件毕业论文
2022-07-05 22:38:25
论文总字数:92959字
摘 要
本投标文件是根据新会碧桂园六期7号~10号楼总承包工程施工图纸,遵照国家及地方的法律、法规和规范,结合工程特点、类似工程施工经验编制而成。本投标文件的重点在于技术标中的施工组织设计和商务标中的投标报价。施工组织设计和投标报价是投标文件编制的难点。在这次毕业设计里,我重点分析了以上两个方面的问题。技术标包括编制说明、工程概况、项目管理机构、施工平面布置、进度计划以及各工程施工方案等。商务标则包括法定代表人身份证明、授权委托书、已标价工程量清单、拟分包项目情况表等等。本设计旨在通过对清单积极模式下的投标文件的编制进一步熟悉投标各个方面流程,对工程投标文件的编制能够熟练掌握。
关键词:投标文件 工程量清单 施工组织设计 投标报价
Xin hui bi gui yuan 6th 7 - 10 construction general contracting bidding documents
Abstract
The tender documents is according to the bi gui yuan 6th 7 ~ 10 construction drawings, in accordance with national and local laws, regulations and norms, combined with engineering characteristics, and similar project construction experience. This tender documents will focus on technology standard of construction organization design and business standard of tender offer. Construction organization design and the difficulties of the tender offer is tender documentation. In this graduation design, I analyzed the above two aspects. Technology standard including manual, engineering survey, project management agencies, construction layout, schedule and various engineering construction plan, etc. Business standard, including proof of identity is the legal representative, a power of attorney, priced bill of quantities, intends to subcontract the project table and so on. This design aims to list the positive mode for further familiar with his bid documents to the various aspects of the process, the project bidding documents compiling can grasp skilled.
Key Words: Bid document; Engineering quantity detailed list; Construction organization design; Bid price quotation
目 录
摘要··················································I
Abstract····················································II
第一部分 投标函及招标文件要求的相关资料···············1
第一章 投标函及其附录···········································1
1.1投标函·············································1
1.2投标函附录······································3
第二章 其他相关材料············································10
2.1法定代表人身份证明及授权委托书·····················10
2.2项目管理机构·······································12
2.3拟分包项目情况表··································21
第二部分 技术标部分············································22
第三章 施工组织设计············································22
3.1 工程概况···········································22
3.2 施工准备···········································22
3.3 施工部署···········································23
3.4 施工组织机构设置···································27
3.5 施工现场总平面布置·································28
3.6 施工进度计划及工期保证措施·························32
3.7 施工质量保证措施······································46
3.8 施工方案···········································59
3.9 降低成本措施·······································79
3.10 安全生产和文明施工保证措施························81
3.11 主要施工机械、设备与材料·························86
3.12 劳动力配备计划··································90
第三部分 商务标部分··········································94
第四章 工程量清单报价表·······································94
4.1 投标总价封面·······································94
4.2 总说明·············································95
4.3 单位工程投标报价汇总表·····························96
4.4 分部分项工程量清单与计价表························98
4.5 工程量清单综合单价分析表····························134
4.6 措施项目清单与计价表(一)·························136
4.7措施项目清单与计价表(二)·························138
4.8 其他项目清单表····································140
4.9 规费、税金项目清单与计价表························141
4.10承包人供应主要材料价格表··························142
第四部分 资格审查材料········································146
第五章 资格审查资料··········································146
5.1 投标人基本情况表····································146
5.2 今年财务状况表········································146
5.3 今年完成的类似项目情况表·····························147
5.4 正在施工的和新承接的项目情况表·······················148
参考文献························································149
致谢·····························································150
请支付后下载全文,论文总字数:92959字