摘 要

在这次毕业设计中,工作共分为三个阶段:作为招标人完成对工程项目的招标文件编制;作为投标人完成对工程项目的投标文件编制;作为毕业生完成对招投标阶段工作的整理修订。在这些工作中,招标文件编制和投标文件编制是主要任务也是毕业设计中的难点。在招标文件编制工作中,难点有两点:一是根据施工图纸与结构图纸,按照国家及地方的现行规范,完成图纸所示的工程量计算;二是根据已计算好的工程量编制工程量清单,完成对清单项目特征的描述。这两项工作十分需要耐心与细心。

在投标文件编制工作中,主要难点也有两点:一是根据自身企业的情况,结合实际,完成对工程量清单的报价。二是根据企业综合实力与经济技术状况,完成技术标的编制,即编写一份施工组织设计来响应招标文件中的相关要求。这项工作十分需要我们结合实际情况来进行编写,不能凭空捏造或者随意编制。完成招标文件和投标文件的编制工作后,就是对之前两项工作进行整理与总结,在这项工作中,我需要审查和检阅之前的各项工作,保证各项任务的科学性、严谨性、规范性。除此以外,我还要将各工作相互联系在一起,保持一致。对各项数据和各种图表的整理,也要严格按照学院要求进行编制和排版。只有认认真真的做好每一项工作,严格按照国家、地方、学院的要求,才能顺利完成所有工作的编制。

关键词:招标文件;投标报价;工程量清单;项目特征;工程量计算;工程概况;招投标

Yu yong city project bidding documents preparation and tender offer

A enterprise

Abstract

In the graduation design, the work will be divided into three stages: as the preparation of the bidding documents of the project is completed by the tenderer, As a bidder to complete the preparation of the bid documents of the project, As a graduate of bidding stage work of revision.In this work, the bidding documents preparation and tender documentation is the main task is the difficulty in the graduation design.In the tender documentation work, there are two difficulties: one is according to the construction drawings and structural drawings, in accordance with national and local current specifications, complete drawings as shown in the calculation of quantities; The second is calculated according to well prepare the bill of quantities of quantities, has complete description of the list item characteristic.These two work very need patience and care.

In the bidding documents preparation work, there are two main difficulties are: one is according to their own enterprises, combining with the actual, complete to bill of quantities quotation. Second, according to the enterprise comprehensive strength and economic and technological condition, complete compiling technical target, namely, write a construction organization design in response to the bidding documents of the relevant requirements.We combined with the actual situation that the work very will need to write, not imagination or random.Develop the tender documents and the bid documents, is carried out on the two work before finishing and summary, in this work, I need to review and inspect the work before, to ensure the scientific nature of the various tasks, rigor, and normative.In addition, I also will all work together, each other. For the sorting of data and all kinds of charts, had to finish college, in strict accordance with the requirements of the compiling and typesetting. Only serious to do every work, strictly in accordance with the requirements of the state, local, school, to complete the preparation of all the work.

Keywords: the bidding documents; Tender offer; Bill of quantities. Project characteristics; Calculation of quantities; Project summary; The bidding

目 录

摘要 I

Abstract II

第一部分毕业设计综述 1

第一章 工程概况 2

第二章 毕业设计任务 3

第二部分豫雍城招标文件编制 8

第一章 招标公告(未进行资格预审) 10

第二章 投标人须知 12

第三章 评标办法(经评审的最低投标价法) 15

第四章 合同条款及格式 17

第五章 工程量清单 28

第六章 图纸 46

第七章 技术标准和要求 48

第三部分豫雍城A企业投标报价 49

第一章 投标函及投标函附录 51

第二章 法定代表人身份证明(略) 52

第三章 授权委托书(略) 52

第四章 联合体协议书(略) 52

第五章 投标保证金 52

第六章 已标价工程量清单 52

第七章 施工组织设计 87

第八章 项目管理机构(略) 96

第九章 资格审查资料(略) 96

第四部分 101

结 束 语 105

谢 辞 106

参 考 文 献 107

第一部分

毕业设计综述

第一章 工程概况

1. 基础结构

1.1基础类型

豫雍城的基础采用桩承台基础形式,基础设计等级为乙级,桩承台基础的桩采用PHC-400(95)AB-C80-12桩型。承台则采用C30泵送商品混凝土浇筑,采用桩承台基础可以减少施工现场的工作量以及材料的消耗,并且桩基具有承载力高、沉降量小,变形小,稳定性好的特点。

剩余内容已隐藏,请支付后下载全文,论文总字数:78056字