湖北省松滋市临港工业园区排水工程设计毕业论文
2021-10-24 16:29:47
摘 要
随着我国城镇化和工业化的步伐不断加快,生产和生活中产生的大量污水的问题也越发突出。如果不加以控制,任由其直接排入水体或者土壤,都会使得土壤或者水体受到污染,原有生态环境遭破坏,以至于引起生态问题,甚至造成公害,在湖北省松滋市临港工业园区,工业废水占有非常大的百分比,工业废水对环境的危害更大。为避免以上情况,就有必要建设一套完整的排水工程,用来收集各种类型污水并及时地将其运送到污水处理厂,妥善处理达到排放标准之后排放,再利用自然水体的自净能力使其恢复为可利用水资源。
湖北松滋市临港工业园区排水工程设计包含雨水管网、排水管网和污水处理厂设计,以及工程投资估算,目的就在于设计一整套完备的排水工程系统,改变该新建工业园区目前排水系统不完善、污水处理能力低的现状,并满足经济、高效、节能的要求。本次设计均采用了国家最新的有关规定、标准、和设计规范。
松滋市临港工业园区人口近期为十二万人,远期二十万人,夏季主导风向为北风,东南风次之,地形坡度变化较小,污水管道与雨水管道根据地形特点,沿地形铺设,污水处理厂建在工业园区的西北角,长江的下游。污水处理厂设计规模近期40000m3/d,远期60000m3/d,本设计按近远期结合设计,远期预留空地。
污水处理厂处理工艺程序为:污水→粗格栅→提升泵房→细格栅→钟式沉砂池→奥贝尔氧化沟→辐流式二沉池→机械搅拌澄清池→平流式消毒接触池→出水。
污泥流程:剩余活性污泥→污泥提升泵房→浓缩脱水一体化车间→污泥外运。
关键词:污水管网系统:雨水管网系统;污水处理厂;奥贝尔氧化沟
Abstract
As the pace of urbanization and industrialization in China continues to accelerate, the problem of large amounts of sewage generated in production and life is becoming more prominent. If it is not controlled, if it is directly discharged into the water or soil, the soil or water will be polluted, and the original ecological environment will be destroyed, causing ecological problems and even causing pollution. In the Lingang Industrial Park of Songzi City, Hubei Province Industrial wastewater accounts for a considerable proportion, and industrial wastewater is even more harmful to the environment. In order to avoid the above situation, it is necessary to build a complete set of drainage works for collecting various sewage and timely transporting it to the sewage treatment plant, properly treating the discharge after reaching the discharge standard, and then using the self-purification ability of the natural water body to restore it to Use water resources.
The design of the drainage project of the Lingang Industrial Park, Songzi City, Hubei includes the design of the rainwater pipe network, the drainage pipe network and the sewage treatment plant, as well as the project investment estimate. The purpose is to design a complete set of drainage engineering system to change the current drainage system of the new industrial park. The status quo of perfection and low sewage treatment capacity, and meet the requirements of economy, high efficiency and energy saving. This design adopts the latest relevant national regulations, standards, and design specifications.
The population of the Lingang Industrial Park in Songzi City is 120,000 in the near future and 200,000 in the future. The north wind prevails in summer, followed by the southeast wind, and the terrain slope changes little. The sewage pipes and rainwater pipes are laid along the terrain according to the terrain characteristics. The treatment plant is built in the northwest corner of the industrial park, downstream of the Yangtze River. The design scale of the sewage treatment plant is 40,000m3 / d in the near term and 60,000m3 / d in the long term. This design is designed according to the combination of the near and the long term, and the open space is reserved in the long term.
The treatment process of the sewage treatment plant is: sewage → coarse grille → lift pump room → fine grille → bell-shaped grit tank → Obel oxidation ditch → radial flow type secondary settling tank → mechanical agitating clarification tank → level flow disinfection contact tank → Out of water.
Sludge process: excess activated sludge → sludge lifting pump house → integrated dehydration workshop → sludge transportation.
Keywords: sewage pipe network system: rainwater pipe network system; sewage treatment plant; Aubeir oxidation ditch
目录
第一章 绪论 10
1.1设计目的及意义 10
1.2设计成果 11
第二章 设计说明书 13
2.1设计原始资料 13
2.1.1自然条件 13
2.1.2城市概况 14
2.1.3工业园区排水现状简述 14
2.1.4工业废水情况 15
2.1.5污水计算及暴雨强度 15
2.2 污水排水方案设计 15
2.2.1 污水处理厂的设置 15
2.2.2 排水体制及其布置形式的选择 16
2.2.3确定排水区界及划分排水流域 17
2.2.4排水管网定线和平面布置的组合 17
2.2.5 控制点的确定 19
2.2.6 设计管段及设计流量的确定 19
2.2.7 污水管道的衔接 20
2.3雨水管网设计 21
2.3.1划分排水流域和管道定线 21
2.3.2雨水管渠系统平面布置原则 21
2.3.3划分设计管段 21
2.3.4划分设计管段的汇水面积 22
2.3.5确定个排水流域的平均径流系数值 22
2.3.6确定设计重现期P、地面集水时间t1 22
2.3.7确定单位面积径流量 22
2.4污水厂设计 22
2.4.1 工艺方案分析 22
2.4.2 污水处理工艺类型 23
2.4.3工艺流程比较 25
第三章 设计计算书 27
3.1污水管道设计计算 27
3.1.1 布置污水管道 27
3.1.2 街区编号并计算其面积 27
3.1.3 设计流量计算 30
3.1.4水力计算 30
3.2雨水管渠系统设计 32
3.2.1划分排水流域和管道定线 32
3.2.2划分设计管段 32
3.2.3划分并计算各设计管段的汇水面积 33
3.2.4水力计算 34
3.3污水厂设计 35
3.3.1水量的计算 35
3.3.2 水质的计算 36
3.3.3 格栅计算 37
3.3.4 污水提升泵房 44
3.3.5 钟式沉砂池 47
3.3.6配水井 49
3.3.7 奥贝尔氧化沟设计 52
3.3.8 辐流式二次沉淀池 61
3.3.9机械搅拌澄清池 64
3.3.10消毒 77
3.3.11污水计量设备 80
3.3.12贮泥池 80
3.3.13污泥浓缩池 80
3.3.14 污泥脱水 82
3.3.15污水处理厂平面布置 84
3.3.16构筑物尺寸 87
3.3.17污水处理厂高程布置 88
第四章 工程投资估算 91
4.1排水管道工程投资估算 91
4.2污水处理厂工程投资估算 91
4.3污水厂运行成本计算 92
第五章 总结 94
参考文献 95
附录 97
附录A污水干管设计流量计算表 97
附录B 污水干管水力计算表 106
附录C雨水管道汇水面积统计表 114
附录D 雨水管道水力计算表 127
致谢 148
第一章 绪论
1.1设计目的及意义
随着中国城市化和工业化进程的不断加快,生产和生活产生大量废水的问题变得越来越严重。如果不加以控制,直接释放到水或土壤中,将污染土壤或水,破坏原始生态环境,造成生态问题,甚至造成公害。为了避免上述情况,有必要建设一套完整的排水工程,用来收集工业废水、生活污水等各种类型的废水,并将这些废水及时处理达到排放标准之后排放再利用。
排水工程在中国社会主义建设中占有重要地位:从环境保护的角度来看,排水工程的建设具有保护和改善环境,减少对环境的污染,减轻、消除污水危害的作用。从对人体健康的角度来看,排水工程的建设有利于预防和控制传染病或“公害病”,是保护人民健康,造福子孙后代的重大事件。在经济层面上,排水工程的建设是经济建设的必要条件,是旨在保证公共水体的水质和淡水资源不被破坏,人民的生命财产安全和生命安全不受影响,工业农业的顺利生产和经营不受限制,并最终保证城市的发展、经济腾飞的必然选择。在城市发展方面,精心设计和建造的城市排水工程系统是城市现代化的里程碑和基准。现代城市不仅必须具有完整的建设基础设施,而且经济建设还必须在城乡建设和环境建设中同时计划,实施和发展,以实现经济,社会和环境效益的统一。