淮安市锦绣百苑小区工程施工组织设计
2023-01-15 14:50:25
论文总字数:25608字
摘 要
改革开放以来,我国经济到已坐上了世界前列的火车,人民的日子也是蒸蒸日上,人口的增长,也带动了住房经济。近年来,高楼小区如雨后春笋,遍地开花,但近年来加上大地震等自然灾害,也暴露出许多问题,反映出建筑主体结构工程的质量直接影响到人们的财产安全。施工工期、成本、质量是施工组织设计直接相关的三个关键要素,在施工组织设计中,要尽可能避免施工过程中出现问题的可能性,取得较高的管理和组织效果。施工组织设计是一种为了引导在施工计划实行中的每一单位所用到的技术和资金,与工程组织相呼应的综合性文件,它能够确保有序、高效、科学合理地进行施工活动,是施工项目管理和施工技术融合并加以利用的产物。工程的大概情况,施工组织的结构设置,计划工期进度,施工的主要方案,怎样妥善布置施工现场,以及工程质量得到保障的措施,是本设计方案主要研究考虑的几个方面。如何对工程进行起到指导和控制,在组建施工组织设计每单位上,必须满足的基本原则,在明文规定的范围中,从个点出发,研究并实现施工效益和经济效益,这两个为目标,从而让工程项目在技术经济上得到满意的增长。
关键词:施工方案;进度计划;保证措施;环境保护;总平布置
Abstract
Since the reform and opening up, my country"s economy has been in a leading position in the world, and people"s lives have become increasingly prosperous. Population growth has also promoted the housing economy. In recent years, high-rise communities have sprung up like mushrooms, but in recent years, coupled with natural disasters such as major earthquakes, many problems have been exposed, reflecting that the quality of the main structure of the building directly affects people"s property. Safety. Construction period, cost and quality are the three key elements directly related to the design of construction organization. When designing the construction organization, the possibility of problems during the construction process should be avoided as much as possible to achieve higher management and organization effects. The construction organization design is a comprehensive document corresponding to the engineering organization. The purpose is to guide each unit in the technology and funds used in the implementation of the construction plan. It can ensure the orderly, efficient, scientific and reasonable construction activities. The comprehensive utilization of products is combined with construction project management and construction technology. Project overview, construction organization structure, planned construction schedule, main construction plan, how to arrange the construction site correctly, and measures to ensure project quality are the main research focus of this design. plan. Within the scope specified in this article, how to guide and control the project, the basic principles that must be met in the organization and design of each unit, start from one point, study and achieve construction benefits and economic benefits, these goals are two, so that Engineering projects have achieved satisfactory growth in both technical and economic aspects.
Key words:construction plan;schedule;guarantee measures;environmental protection;general layout
目 录
摘 要 I
Abstract II
第一章 引言 1
第二章 工程概况 2
2.1 工程名称:淮安市锦绣百苑小区 2
2.2 工程施工条件 4
2.3 施工组织设计与管理 4
2.4 材料的供应 4
2.5 施工平面布置 5
2.6 施工用电、用水计划 5
2.7 临时设施 5
第三章 施工组织机构设置 6
3.1 项目部组成 6
3.2 管理机构职能划分 6
第四章 工期承诺和保证措施及进度计划 7
4.1 工期承诺和保证措施 7
4.1.1 工程管理目标及施工进度计划 7
4.1.2 保证措施 7
4.2 施工进度计划 7
第五章 主要部分项目工程施工方案 8
5.1 施工测量 8
5.1.1 土方钻探 9
5.1.2 模板工程 9
5.1.3 钢筋施工 9
5.1.4 混凝土工程 9
5.2 脚手架工程 9
5.3 防水工程 11
5.4 装饰工程 12
第六章 材料供应安排及机械设备配置及劳动力安排 13
6.1 物资准备 13
6.2 施工机械准备 13
6.2.1 施工机械设备配备 13
6.2.2 拟投入的主要施工机械设备配备 13
6.3 劳动力安排 14
第七章 施工质量保证措施 15
7.1 施工过程控制 15
7.2 确保工程质量的技术组织措施 15
7.3 物资采购质量保证 15
7.4 技术保证措施 16
7.5 经济保证措施 16
7.6 合同保证措施 16
第八章 施工安全保证措施 17
8.1 安全生产方针:安全第一,预防为主 17
8.2 安全生产管理体系 17
8.3 劳动保护用品管理 17
第九章 施工现场文明施工措施与成本控制 18
9.1 易燃易爆危险品安全使用措施 18
9.2 生产污水的处理措施 18
9.3 扬尘治理措施 18
9.4 施工成本控制 19
第十章 结论 21
谢辞 22
参考文献 23
附录 24
附录1 24
附录2 24
附录3 28
附录4 30
剩余内容已隐藏,请支付后下载全文,论文总字数:25608字